Stages of Construction for Newly Built Homes (2024)

Stages of Construction for Newly Built Homes (1)

Stage 1: Site preparation & foundation pour

After clearing the site of trees and debris, the construction crew levels the ground, puts up wooden forms to serve as a foundation template and digs any necessary holes and trenches. Footings (structures where the house interfaces with the earth that supports it) are installed. If your home is going to have a well, it will be dug at this point.

If the home is designed with a full basem*nt, the hole is dug, the footings are formed and poured, and the foundation walls are formed and poured. If it’s slab-on-grade, the footings are dug, formed and poured; the area between them is leveled and fitted with utility runs (e.g. plumbing drains and electrical chases); and the slab is poured.

Once concrete is poured into the holes and trenches, it will need time to cure. After the concrete is cured, the crew applies waterproofing membrane to the foundation walls; installs drains, sewer and water taps and any plumbing that needs to go into the first-floor slab or basem*nt floor; and backfills excavated dirt into the hole around the foundation wall.

INSPECTION #1:After the curing process, an inspector visits the site to ensure foundation components are up to code and installed properly. This inspection may be repeated depending on the type of foundation (slab, crawl space or basem*nt). The builder will then remove the forms and begin coordinating stage 2, the framing phase.

Stage 2: Rough framing

The floor, walls and roof systems are completed. Plywood or oriented strand board sheathing is applied to the exterior walls and roof, and windows and exterior doors are installed. The sheathing is then covered with a protective barrier known as a house wrap to prevent liquid water from infiltrating the structure, while allowing water vapor to escape. This reduces the likelihood of mold and wood rot.

Stage 3: Rough plumbing, electrical, & HVAC

Once the shell is finished, siding and roofing can begin. At this time, the electrical and plumbing contractors can also run pipes and wires through the interior walls, ceilings and floors. Sewer lines and vents, as well as water supply lines for each fixture, are installed. Bathtubs and one-piece shower/tub units are put in place.

Ductwork is installed for the heating, ventilation and air-conditioning (HVAC) system, and possibly the furnace. HVAC vent pipes are installed through the roof, and insulation is installed in the floors, walls and ceilings.

After the roofing is on, the electrician installs receptacles for outlets, lights and switches and runs wires from the breaker panel to each receptacle. Wiring for telephones, cable TV and music systems is included in this work.

INSPECTIONS 2, 3 and 4:Rough framing, plumbing and electrical and mechanical systems are inspected for compliance with building codes. Most likely these will be three different inspections. At the very least, the framing inspection will be conducted separately from the electrical/mechanical inspections.

Stage 4: Insulation

Insulation helps to create a more comfortable, consistent indoor climate while significantly improving a home’s energy efficiency. Most homes are insulated in all exterior walls, as well as the attic and any floors that are located above unfinished basem*nts or crawl spaces.

Stage 5: Drywall, interior primer finishes & begin finishes

Drywall is hung and taped so the seams between the boards aren’t visible, and drywall texturing (if applicable) is completed. The primer coat of paint is also applied after taping is complete. Contractors then begin installing exterior finishes such as brick, stucco, stone and siding.

Stage 6: Finish interior trim; install exterior driveways & walkways

Interior doors, baseboards, door casings, windowsills, moldings, stair balusters and other decorative trim are installed, along with cabinets, vanities and fireplace mantels and surrounds. Walls get a final coat of paint.

Exterior driveways, walkways and patios are generally formed at this stage, but some builders prefer to wait until the end of the project before pouring the driveway.

Install hard-surface flooring and countertops; complete exterior grading: Ceramic tile, vinyl and wood flooring are installed as well as countertops. Exterior finish grading is completed to ensure proper drainage away from the home and prepare the yard for landscaping.

Finish mechanical trims and install bath fixtures. Light fixtures, outlets and switches are installed and the electrical panel is completed. HVAC equipment is installed and registers completed. Sinks, toilets and faucets are put in place.

Mirrors, shower doors and carpeting are installed, and final cleanup takes place. Trees, shrubs and grass are planted and other exterior landscaping is completed.

INSPECTION #5:A building-code official completes a final inspection and issues a certificate of occupancy (C.O.). If any defects are found during this inspection, a follow-up inspection may be scheduled to ensure that they’ve been corrected.

Stage 7: Final walkthrough

Your builder will walk you through your new home to acquaint you with its features and the operation of various systems and components. There will also be an explanation of your responsibilities for maintenance and upkeep as well as warranty coverage and procedures. It’s also an opportunity to spot items that need to be corrected or adjusted, so be attentive and observant. Examine the surfaces of countertops, fixtures, floors and walls for possible damage that can be documented and/or repaired prior to move in.


Stages of Construction for Newly Built Homes (2)

Get in touch!

For information about any of our properties, selling your home, or questions about our brokerage, please don't hesitate to contact us today!


New Construction Resources
  • Benefits of Buying New
  • New Construction FAQ
  • Types of New Construction Homes
  • New Construction Financing
  • New Home Purchase Process
  • Stages of Construction
  • Featured Builders

Stages of Construction for Newly Built Homes (2024)

FAQs

Stages of Construction for Newly Built Homes? ›

Generally, when CONSTRUCTING a house, assuming that all the preconstruction necessities have been attended to. First thing is the construction of the foundations. Then the ground floor is constructed. Then the floors above, starting lower and going upwards, are constructed.

What are the 7 stages of construction? ›

The 7 Essential Stages of a Successful Construction Project
  • Project conception. Every construction project begins with an idea, and the idea or the conception behind a particular project requires thoughtful consideration. ...
  • Planning and design. ...
  • Preconstruction. ...
  • Procurement. ...
  • Construction. ...
  • Closeout. ...
  • Post-construction.
Jan 14, 2023

In what order is a house built? ›

Generally, when CONSTRUCTING a house, assuming that all the preconstruction necessities have been attended to. First thing is the construction of the foundations. Then the ground floor is constructed. Then the floors above, starting lower and going upwards, are constructed.

What is the timeline for constructing a house? ›

On average, it takes about seven months to construct a house​​. However, the timeline extends when factoring in pre-construction stages like planning and obtaining permits, which often round up to a year-long commitment.

What are the 10 steps to building a house? ›

10 Steps To Building A Home
  1. Decide On The Layout & Design Of Your Home. ...
  2. Prepare Property For Construction. ...
  3. Build The Frame Of The House. ...
  4. HVAC, Electrical, & Plumbing Installation. ...
  5. Roof & Exterior Siding. ...
  6. Insulation & Interior Drywall. ...
  7. Flooring & Fixtures. ...
  8. Landscaping & Final Touches.
Sep 30, 2022

How long from drywall to house completion? ›

This is when the inside of your house starts to look like a house, with the drywall and most of the carpentry completed. Expect about two months. Finish work. In the final two months, contractors install the floors, paint and finish the plumbing and electrical work.

What is the longest stage of building a house? ›

It's often the practical completion stage, which includes both the internal fit-out when walls and ceilings are plastered, the tiling is done and kitchens and bathrooms are installed, as well as finishing works, like painting and laying floor coverings, that's one of the longest stages.

How long after foundation is framing? ›

Traditionally, it takes two weeks to finish this phase, though weather conditions may alter the timeline. The concrete must have time to dry and cure before the framing and roofing can begin. Once the foundation is in place and completely dry, it's time for the framing and roofing contractors to enter the picture.

At what stage of construction are windows installed? ›

In new construction, they would usually go in before drywall. The most critical part of window installation is done on the outside. They need to be installed before exterior finishes are applied, and flashed for a water tight enclosure. Windows and doors should install before drywall.

What is the correct order of construction? ›

What is the order of construction? Construction order refers to the major sequence of work followed while constructing a building. Construction order typically starts with marking, excavation, foundation, framing, brick masonry, roofing, flooring, and finishing.

How to build a house in stages? ›

A Step-by-Step Guide to the Home Building Process
  1. Prepare Construction Site and Pour Foundation.
  2. Complete Rough Framing.
  3. Complete Rough Plumbing, Electrical and HVAC.
  4. Install Insulation.
  5. Complete Drywall and Interior Fixtures; Start Exterior Finishes.
  6. Finish Interior Trim; Install Exterior Walkways and Driveway.

What are the stages of framing a house? ›

How to frame your house
  • Step 1: Pick up everything you'll need. ...
  • Step 2: Frame the floor. ...
  • Step 3: Frame your walls. ...
  • Step 4: Frame your ceiling. ...
  • Step 5: Frame additional floors. ...
  • Step 6: Add stairs. ...
  • Step 7: Frame your roof. ...
  • Step 8: Install your sheathing.
Dec 23, 2022

What are the 7 phases of a project? ›

The Project Lifecycle consists of seven phases intake, initiation, planning, product selection, execution, monitoring & control, and closure. These phases make up the path that takes your project from start to finish.

What are the 8 stages of the construction cycle? ›

Throughout this eBook, we will take you through each stage of construction – Foundations, Substructure, Superstructure, Roofs, First and Second Fix, Surface Finishes and External Works – with a number of technical articles that outline common issues faced within each stage, with suggested ways to overcome these issues ...

What are the 7 steps of the site preparation process? ›

Effective site preparation involves a series of well-coordinated steps:
  1. Site Assessment. The first step is to assess the site thoroughly. ...
  2. Clearing and Demolition. ...
  3. Excavation and Grading. ...
  4. Soil Stabilization. ...
  5. Utilities and Infrastructure. ...
  6. Erosion Control and Environmental Compliance. ...
  7. Site Security. ...
  8. Comprehensive Site Assessment.
Sep 12, 2023

What are the 7 phases of the architectural design process? ›

The architectural design process is made up of seven phases: pre-design, schematic design, design development, construction documents, building permits, bidding and negotiation and construction administration. These phases put realistic project deliverables and deadlines in place.

Top Articles
Latest Posts
Article information

Author: Rev. Leonie Wyman

Last Updated:

Views: 6262

Rating: 4.9 / 5 (59 voted)

Reviews: 90% of readers found this page helpful

Author information

Name: Rev. Leonie Wyman

Birthday: 1993-07-01

Address: Suite 763 6272 Lang Bypass, New Xochitlport, VT 72704-3308

Phone: +22014484519944

Job: Banking Officer

Hobby: Sailing, Gaming, Basketball, Calligraphy, Mycology, Astronomy, Juggling

Introduction: My name is Rev. Leonie Wyman, I am a colorful, tasty, splendid, fair, witty, gorgeous, splendid person who loves writing and wants to share my knowledge and understanding with you.